![]() |
City of Portland, Bureau of Water Works ISI completed 3D CAD modeling and drafting for preliminary engineering and final design of the Conduit Isolation and Improvements project. The design includes nine 66-inch valves with motor actuators and controls to coordinate operations. In addition, a number of bypass, drain, vent, and sampling valves are needed to operate the system With the many changes and what-ifs that were addressed during the design of this project 3D CAD tools saved a lot of time. Many design changes require many sheet updates in the 2D CAD world. However, with the modification of 3D models, 2D drawings are automatically updated, improving quality assurance. |
Other Services:
Electrical